Gunsan Port pier status
  • Gunsan Port pier status

    Pier name Length Planned depth Berthing
    capacity(DWT)
    Unloading capacity
    (thousand tons)
    Products handled
    Pier 1 525m (-)9~11m 20,000×1 berth
    10,000×2 berths
    1,369 Supplementary animal feed
    materials, lumber etc.
    Pier 2 551m (-)9~11m 20,000×2 berths
    5,000×1 berth
    1,463 Lumber, scrap metal etc.
    Pier 3 640m (-)9~11m 20,000×3 berths 1,889 Cement, liquid cargo etc.
    Pier 1 was constructed in 1979, pier 2 in 1989, pier 3 in 1995 and are all connected in a 'ㄷ‘ shape. Primary products handled in these piers include lumber, supplementary animal feed materials, cement, liquid cargo etc..
    Gunsan Port pier 1-3 Gunsan Por pier 1-3
  • Pier name Length Planned depth Berthing
    capacity(DWT)
    Unloading capacity
    (thousand tons)
    Products handled
    Pier 4 600m (-)11m 20,000×2 vessels 3,514 Automobiles only
    Daewoo Motors constructed 1 berth at pier 4 in 1997 while CJ Korea Express constructed an additional berth in 2012. The pier is used exclusively for automobiles.
    Gunsan Port pier 4 Gunsan Port pier 4
  • Pier name Length Planned depth Berthing
    capacity(DWT)
    Unloading capacity
    (thousand tons)
    Products handled
    Pier 5 1,680m (-)11m 20,000×8 vessels 5,410 Automobiles, lumber etc.
    Pier 5 was completed in 2004 as part of the Gunjang new port construction plan. It primarily handles products such as automobiles, pulp, steel, animal feed materials etc.
    Gunsan Port pier 5 Gunsan Port pier 5
  • Pier name Length Planned depth Berthing
    capacity(DWT)
    Unloading capacity
    (thousand tons)
    Products handled
    Pier 6 930m (-)11~13m 20,000×1 vessels
    30,000×3 vessels
    6,479 Grain, containers
    Pier 6 was completed in May 2004 with 3 100,000 ton capacity grain silos, 2 gantry cranes, and currently exclusively handles grain cargo and containers.
    Gunsan Port pier 6 Gunsan Port pier 6
  • Pier name Length Planned depth Berthing
    capacity(DWT)
    Unloading capacity
    (thousand tons)
    Products handled
    Pier 7 1,300m (-)13~14m 50,000×2 vessels
    30,000×3 vessels
    5,030 Lumber, pulp etc.
    Pier 7 was completed in June 2011 (public) and August 2011 (private), and is capable of berthing 2 30,000 DWT vessels. The pier primarily handles cargo such as lumber, pulp, animal feed materials etc.
    Gunsan Port pier 7
SITE MAP
  1. INTRODUCTION
    1. Greeting
    2. History of Office
    3. Organization
    4. Location Map
  2. PORT INFORMATION
    1. Gunsan Port Overview
    2. Gunsan Port pier status
    3. Exclusive piers
    4. Janghang Port
    5. Inner port
    6. Saemangeum Shinhang(new port) construction
    7. User information and port entry/exit
    8. Other information
  3. SAFETY & SECURITY
    1. General
    2. VTS Area
    3. Reporting, Pilotage and Communication
    4. VTS Website
  4. MARITIME AFFAIRS SAFETY FACILITIES
    1. Origin of lighthouses
    2. History of lighthouses in Korea
    3. Timeline for navigational beacons
    4. Navigational beacons overview
    5. Navigational beacon management office
    6. Navigational Aids Patrol Ships
    7. International maritime buoyage system
  5. MARINE ENVIROMENT
    1. What are public waters?
    2. Marine enviromental remediation activities
    3. Sea area utilization consultation
    4. Management of uninhabited islands
  6. PASSENGER TRANSPORT
    1. Passenger Transport