History of Office

Gunsan Port·Janghang Port

    • 2010.11.
    • ~ 2015.11.
    • (scheduled) Construction of lighters wharf at Janghang Port - 820m
    • 2010.02.
    • ~ 2012.06.
    • Construction of sand pier [1 DWT 3,000 ton berth]
    • 2008.04.
    • ~ 2010.12.
    • Construction of exclusive port (not controlled by the Office) for automobiles at Gunsan Port-300m
      [1 DWT 20,000 ton berth]
    • 2007.08.
    • ~ 2011.08.
    • Construction of pier for miscellaneous goods (2 berths) (private sector investment)
      [2 DWT 30,000 ton berths]
    • 2006.03.
    • ~ 2009.11.
    • Construction of south side seawall at Gunsan Port-850m
    • 2005.12.
    • ~ 2011.06.
    • Construction of south side inner wall (construction lot no. 3)-800m
      [2 DWT 50,000 ton berths, 1 DWT 30,000 ton berth]
    • 2003.07.
    • ~ 2007.07
    • Development of Gunsan Bieung Port (private sector investment)
    • 2003.03.
    • ~ 2004.12.
    • Construction of service pier at Gunsan Port-210m
      [3 floating piers 3]
    • 2002.08.
    • ~ 2003.10.
    • Construction of coastal passenger ferry pier at Gunsan Port-150m
      [5 floating piers]
    • 1999.12.
    • ~ 2002.12.
    • Construction of international passenger ferry pier at Gunsan Port -180m
      [1 DWT 15,000 ton berth]
    • 1998.10.
    • ~ 2001.12.
    • Construction of south side inner wall (construction lot no. 2) at Gunjang Shinghang (new port)-1,350m
      3 DWT 20,000 ton berths,【1 DWT 30,000 ton berth, 2 2,000 TEU berths】
    • 1995.10.
    • ~ 2000.11.
    • Janghang Port new port pier-330m【2 DWT 10,000 ton berths】⇒ capable of berthing
      DWT 20,000 ton vessels
    • 1992.11.
    • ~ 1998.12.
    • Construction of Pier 5 at Gunsan Waehang (outer port)-1,260m【6 DWT 20,000 ton berths】
    • 1990.08.
    • ~ 1997.10.
    • Construction of south side longitudinal dike at Gunjang Shinhang (new port)-2,912m
    • 1995.06.
    • ~ 1997.03.
    • Construction of north side longitudinal dike at Gunjang Shinhang (new port)-7,100m
    • 1992.11.
    • ~ 1995.07.
    • Construction of Daewoo Motors pier at Gunsan Port-300m【1 DWT 20,000 ton berth】
    • 1989.12.
    • ~ 192.10.
    • Construction of Pier 3 at Gunsan Waehang (outer port)-640m【3 DWT 20,000 ton berths】
    • 1985.10.
    • ~ 1989.12.
    • Construction of service pier at Gunsan Waehang (outer port)-144m【3 floating piers】
    • 1985.09.
    • ~ 1990.06.
    • Construction of lighters wharf for fishing vessels at Janghang Port-883m
    • 1980.11.
    • ~ 2006.12.
    • Construction of Pier 2 at Gunsan Waehang (outer port)-551m
      【2 DWT 20,000 ton berths, 1 DWT 5,000 ton berth】
    • 1974.07.
    • ~ 1979.06.
    • Construction of temporary dike at Gunsan Naehang (inner port)-2,418m【renovated site 610,000 pyeong】
    • 1961.
    • Construction of Pier 1 at Gunsan Waehang (outer port)-525m
      【1 DWT 20,000 ton berth, 2 DWT 10,000 ton berth】
    • 1944.
    • Installation of 1 floating pier at Janghang Port【1 DWT 8,000 ton berth】
    • 1938.01.01.
    • Opening of Janghang Port
    • 1925 ~ 1933
    • Installation of 3 floating piers at Gunsan Port【3 DWT 3,000 ton berths】
    • 1899.05.01
    • Opening of Gunsan Port

Saemangeum

  1. 2011.12.28.
    • Commencement of construction works for the Saemangeum Shinhang (new port) seawall (phase 1)
  2. 2011.12.16.
    • Environmental impact assessment service for the Saemangeum Shinhang (new port) development project
  3. 2011.03.
    • Deliberation·confirmation of the Saemangeum Master Plan (Saemangeum Development Committee)
  4. 2010.12.03.
    • Public announcement of the Saemangeum Shinhang (new port) Development Master Plan and pre-arranged area for development
  5. 2010.10.
    • Saemangeun Shinhang (new port) master plan revision service
  6. 2009.10.
    • Saemangeum Shinhang (new port) preliminary feasibility study (simplified study) service (KDI)
  7. 2009.05.
    • Saemangeum Shinhang (new port) locational inquiry service
      (Ministry of Land, Transport and Maritime Affairs)
  8. 2008.09.
    • Selected as one of the 30 key pioneering projects for the metropolitan economic region
      (Presidential Committee on Balanced National Development)
  9. 2008.02.
    • Establishment of the Saemangeum Development Project Plan (Presidential committee)
  10. 1999.03.
    • Postponement of the Master Plan for Construction of New Harbor (SOC Committee)
  11. 1997.05.
    • Establishment of the Master Plan for Construction of New Harbor and designation of the construction site
SITE MAP
  1. INTRODUCTION
    1. Greeting
    2. History of Office
    3. Organization
    4. Location Map
  2. PORT INFORMATION
    1. Gunsan Port Overview
    2. Gunsan Port pier status
    3. Exclusive piers
    4. Janghang Port
    5. Inner port
    6. Saemangeum Shinhang(new port) construction
    7. User information and port entry/exit
    8. Other information
  3. SAFETY & SECURITY
    1. General
    2. VTS Area
    3. Reporting, Pilotage and Communication
    4. VTS Website
  4. MARITIME AFFAIRS SAFETY FACILITIES
    1. Origin of lighthouses
    2. History of lighthouses in Korea
    3. Timeline for navigational beacons
    4. Navigational beacons overview
    5. Navigational beacon management office
    6. Navigational Aids Patrol Ships
    7. International maritime buoyage system
  5. MARINE ENVIROMENT
    1. What are public waters?
    2. Marine enviromental remediation activities
    3. Sea area utilization consultation
    4. Management of uninhabited islands
  6. PASSENGER TRANSPORT
    1. Passenger Transport